slide 1 slide 2 slide 3

Projects

 

EVA               EVACUATION AND TREATMENT WASTEWATER, DEEP SEA DİSCHARGE PROJECTS

 

STARTING DATE

END

DATE

ADMINISTRATION

PROJECT NAME

12.05.2017

ongoing project

İLLER BANK

YILDIZELİ (SİVAS) WASTEWATER TREATMENT PLANT FINAL PROJECT

14.04.2017

ongoing project

DSİ GENEL MÜDÜRLÜĞÜ İÇMESUYU DAİRESİ BAŞKANLIĞI

NİĞDE ULUKIŞLA DRINKING WATER TRANSMISSION LINE AND TREATMENT PLANT PROJECT CONSTRUCTION

05.01.2017

ongoing project

DSİ GENEL MÜDÜRLÜĞÜ İÇMESUYU DAİRESİ BAŞKANLIĞI

AFYONKARAHİSAR SANDIKLI DRINKING WATER TREATMENT PLANT PROJECT CONSTRUCTION

04.01.2017

ongoing project

İLLER BANK

ALTINYAYLA (BURDUR) WASTEWATER TREATMENT PLANT FINAL  PROJECT

04.01.2017

ongoing project

İLLER BANK

KARAKAPI (NİĞDE) WASTEWATER TREATMENT PLANT FINAL  PROJECT

24.06.2016

ongoing project

BASKİ GENERAL DIRECTORATE

ERDEK WASTEWATER TREATMENT PLANT FINAL PROJECT

16.02.2016

ongoing project

DSİ GENERAL DIRECTORATE DRINKING WATER DEPARTMENT

MUĞLA DRINKING WATER TREATMENT PLANT PROJECT CONSTRUCTION

11.02.2016

ongoing project

BASKİ GENERAL DIRECTORATE

ALTINOLUK DOĞU BÖLGESİ VE GÜRE quarter WASTEWATER TREATMENT PLANT FINAL  PROJECT

01.10.2015

ongoing project

DSİ Waste WATER DEPARTMENT

NİĞDE STAGE II DOMESTIC  WATER TREATMENT PLANT PROJECT CONSTRUCTION

22.12.2014

ongoing project

DSİ Waste WATER DEPARTMENT

 

ANKARA DRINKING WATER  STAGE II. (GEREDE SYSTEM) IŞIKLI REGÜLATÖR POND  WASTEWATER STORAGE VE WATER TREATMENT PLANT PROJECT CONSTRUCTION

01.08.2016

07.07.2017

İLLER BANK

HOPA CONVENTIONALDRINKING WATER TREATMENT PLANT PROJECT

03.04.2015

15.04.2016

İLLER BANK

BOLU (CENTRAL) PREPARATION OF WASTEWATER TREATMENT PLANT FEASIBILITY

14.04.2013

01.06.2016

THER REPUBLİC OF TURKEY ENVIRONMENT AND URBAN MINISTRY

PRESIDENCY OF EU INVESTMENT COMPANY

NİZİP DRINKING WATER TREATMENT PLANT PROJECT

03.06.2015

05.10.2015

BASKİ GENERAL DIRECTORATE

SAVAŞTEPE DISTRICT SETTING WASTEWATER TREATMENT PLANT  FINAL PROJECT

03.12.2014

30.04.2015

İLLER BANK

ÜRGÜP (NEVŞEHİR) WASTEWATER TREATMENT PLANT FINAL  PROJECT

24.04.2014

11.02.2015

İLLER BANK

RİZE III. DEEP SEA DISCHARGE FINAL PROJECT

17.10.2012

15.09.2014

KOCAELİ City WATER GENERAL DIRECTORATE

KARAMÜRSEL, KÖRFEZ, KULLAR, YENİKÖY and 42 EVLER PREPARATION OF REVISION WORKSHOP PROJECTS WITH WASTE WATER TREATMENT PLANTS

26.12.2012

10.04.2014

İLLER BANK GENERAL DIRECTORATE

TOMARZA WASTEWATER TREATMENT PLANT FINAL  PROJECT

04.07.2012

04.03.2014

İNTAŞ İNŞ. TAAH. TİC. A.Ş.

AL-TUZ KENTİ CONSTRUCTION OF MAPS AND PROJECT STUDIES OF WASTE, RAIN WATER,  WASTEWATER AND WASTEWATER TREATMENT PLANT PROJECTS

13.10.2011

31.07.2013

İLLER BANKASI GENERAL DIRECTORATE

ORTAKÖY WASTEWATER TREATMENT PLANT FINAL  PROJECT

07.05.2010

24.05.2013

İLLER BANKASI GENERAL DIRECTORATE

ÖZALP WASTEWATER TREATMENT PLANT FINAL  PROJECT

26.12.2011

16.04.2013

İLLER BANKASI GENERAL DIRECTORATE

 

ÇOBANLAR IŞIKLAR SÜLÜMENLİ KOCAÖZ  WASTEWATER TREATMENT PLANT FINAL  PROJECT

13.09.2011

11.02.2013

İLLER BANKASI GENERAL DIRECTORATE

RİZE II. DEEP SEA DISCHARGE FINAL PROJECT

13.09.2011

04.12.2012

 

İLLER BANKASI GENERAL DIRECTORATE

KEMALPAŞA DEEP SEA DISCHARGE FINAL PROJECT

23.01.2012

26.09.2012

DSİ GENERAL DIRECTORATE

KIRKLARELİ MERKEZ WASTEWATER TREATMENT PLANT FINAL  PROJECT

27.01.2012

23.07.2012

DSİ GENERAL DIRECTORATE

EDİRNE UZUNKÖPRÜ WASTEWATER TREATMENT PLANT FINAL  PROJECT

31.12.2010

06.07.2012

İLLER BANKASI GENERAL DIRECTORATE

SAZLI WASTEWATER TREATMENT PLANT FINAL  PROJECT

13.05.2011

05.04.2012

 

İLLER BANK GENERAL DIRECTORATE

AMASRA (KASTAMONU) DEEP SEA DISCHARGE FINAL PROJECT

12.11.2010

23.02.2012

İLLER BANK GENERAL DIRECTORATE

BEŞİKDÜZÜ (TRABZON) DEEP SEA DISCHARGE FINAL PROJECT

30.04.2009

21.10.2011

İLLER BANK GENERAL DIRECTORATE

19 MAYIS (SAMSUN) WASTEWATER TREATMENT PLANT FINAL  PROJECT

21.01.2011

19.10.2011

İLLER BANK GENERAL DIRECTORATE

 

KUMBAĞ (TEKİRDAĞ) SEWERAGE  TRANSMISSION LINES FINAL PROJECT

27.08.2010

24.06.2011

İLLER BANK GENERAL DIRECTORATE

19 MAYIS (SAMSUN) DEEP SEA DISCHARGE FINAL PROJECT

16.11.2009

24.06.2011

State Water Works DSİ GENERAL DIRECTORATE

ATASU BARAJI (TRABZON) WASTEWATER TREATMENT PLANT CONSTRUCTION  PROJECT

24.04.2009

27.12.2010

İLLER BANKASI GENERAL DIRECTORATE

BİGA (ÇANAKKALE) WASTEWATER TREATMENT PLANT FINAL  PROJECT

18.09.2007

04.05.2010

ELBİSTAN MUNICIPALITY

ELBİSTAN MUNICIPALITY DRINKING WATER REHABILITATION AND WASTEWATER TREATMENT PROJECT

03.07.2007

29.01.2009

İLLER BANK GENERAL DIRECTORATE

SERİNHİSAR (DENİZLİ) WASTEWATER TREATMENT PLANT FINAL  PROJECT

19.07.2007

16.07.2008

İLLER BANK GENERAL DIRECTORATE

BULANCAK (GİRESUN) DEEP SEA DISCHARGE FINAL PROJECT

29.09.2006

07.12.2007

İLLER BANK GENERAL DIRECTORATE

TATVAN (BİTLİS) WASTEWATER TREATMENT PLANT FINAL  PROJECT

05.05.2005

05.07.2006

İLLER BANK GENERAL DIRECTORATE

SÜRMENE (TRABZON) DEEP SEA DISCHARGE FINAL PROJECT

29.07.2005

18.04.2006

Turkish Development Bank

OKURCALAR (ANTALYA) WASTE WATER TREATMENT PLANT AND SEWERAGE COLLECTOR LINE APPLICATION PROJECT

09.08.2005

10.04.2006

Turkish Development Bank

OKURCALAR (ANTALYA)  DEEP SEA DISCHARGE APPLICATION  PROJECT CONSTRUCTION

24.05.2004

29.12.2004

İLLER BANK GENERAL DIRECTORATE

KEPEZ (ÇANAKKALE) WASTEWATER TREATMENT PLANT FINAL  PROJECT

27.05.2004

29.11.2004

 İLLER BANK GENERAL DIRECTORATE

OF (TRABZON) DEEP SEA DISCHARGE FINAL PROJECT

30.01.1997

10.10.2001

REPUBLİC OF TURKEY PRIME MINISTRY GAP REGIONAL DEVELOPMENT ADMINISTRATION

BESNİ SEWERAGE NETWORK AND WATER TREATMENT PLANT PROJECT

15.11.1996

05.11.1999

REPUBLİC OF TURKEY PRIME MINISTRY GAP REGIONAL DEVELOPMENT ADMINISTRATION

YAVUZELİ SEWERAGE NETWORK AND WATER TREATMENT PLANT PROJECT

 

 

 

INFRASTRUCTURE PROJECTS

 

STARTING DATE

END

DATE

ADMINISTRATION

PROJECT NAME

28.06.2017

ongoing project

İLLER BANK

ARHAVİ (ARTVİN) DRINKING WATER WATER SUPPLY AND WAREHOUSES FINAL PROJECT

14.04.2017

ongoing project

DSİ I GENERAL DIRECTORATE DRINKING WATER DEPARTMENT

NİĞDE ULUKIŞLA DRINKING WATER TRANSMISSION LINE AND TREATMENT PLANT CONSTRUCTION PROJECT

05.01.2017

ongoing project

DSİ I GENERAL DIRECTORATE DRINKING WATER DEPARTMENT

AFYONKARAHİSAR SANDIKLI DRINKING WATER TREATMENT PLANT PROJECT CONSTRUCTION

17.11.2016

ongoing project

DSİ I GENERAL DIRECTORATE DRINKING WATER DEPARTMENT

KIRŞEHİR ÇİÇEKDAĞI DRINKING WATER TREATMENT PLANT PROJECT CONSTRUCTION

16.02.2016

ongoing project

DSİ I GENERAL DIRECTORATE DRINKING WATER DEPARTMENT

MUĞLA DRINKING WATER TREATMENT PLANT PROJECT CONSTRUCTION

17.12.2015

ongoing project

MESKİ I GENERAL DIRECTORATE

MERSİN İLİ KUMKUYU MAHHALLESİ DRINKING WATER PROJECT

28.10.2015

ongoing project

İLLER BANK

 

ESPİYE GÖRELE, TİREBOLU (GİRESUN) WATER INTAKE STRUCTURE AND TREATMENT PLANT, TRANSMISSION LINES, NETWORK STORAGE AND FINAL PROJECT

17.08.2015

ongoing project

BASKİ I GENERAL DIRECTORATE

 

HAVRAN DISTRICT DRINKING WATER TANK, UTILITY, Catchment, TRANSMISSION LINES AND PROMOTION FINAL PROJECT PREPARATION WORK

30.07.2015

ongoing project

BASKİ I GENERAL DIRECTORATE

ALTINOLUK’UN EASTERN REGION SEWERAGE PROJECT CONSTRUCTION

13.07.2015

ongoing project

BASKİ I GENERAL DIRECTORATE

ERDEK DISTRICT SEWERAGE PROJECT CONSTRUCTION

30.06.2015

ongoing project

MESKİ I GENERAL DIRECTORATE

MERSİN, ANAMUR DISTRICT DRINKING WATER TRANSMISSION LINE PROJECT

23.03.2015

ongoing project

MESKİ I GENERAL DIRECTORATE

MERSİN , BOZYAZI DISTRICT, TEKELİ-TEKMEN QUARTERS DRINKING WATER TRANSMISSION LINE PROJECT PREPARATION

01.08.2016

07.07.2017

İLLER BANK

HOPA CONVENTIONAL DRINKING WATER TREATMENT PLANT PROJECT

23.11.2015

13.06.2017

İLLER BANK

 

HOPA (ARTVİN) DRINKING WATER TREATMENT PACKAGE PRELIMINARY STUDIES, TRANSMISSION LINE, AND NETWORK STORAGE FINAL PROJECT

17.03.2016

11.11.2016

İLLER BANK

NİKSAR (TOKAT) FINAL STORM WATER PROJECT

09.12.2016

08.03.2016

İLLER BANK

MECİTÖZÜ (ÇORUM) FINAL DRINKING WATER PROJECT

03.03.2016

29.06.2016

İLLER BANK

HACIBEKTAŞ (NEVŞEHİR) ADDITIONAL FINAL DRINKING WATER PROJECT

09.12.2015

21.06.2016

İLLER BANK

ÇİTGÖL (KÜTAHYA) SEWERAGE FINAL PROJECT

14.04.2013

01.06.2016

 

REPUBLIC OF TURKEY ENVIRONMENT AND URBAN MINISTRY

PRESIDENCY OF EU INVESTMENT COMPANY

NİZİP DRINKING WATER AND WASTEWATER TREATMENT PLANT PROJECT

07.10.2015

27.04.2016

İLLER BANK

GÜRYILDIZ (TOKAT)  DRINKING WATER FINAL PROJECT

11.11.2015

12.04.2016

İLLER BANK

 

HACIBEKTAŞ (NEVŞEHİR) DRINKING WATER TREATMENT PLANT PACKAGE PRELIMINARY STUDIES, TRANSMISSION LINE, TANK FINAL PROJECT

10.10.2012

19.02.2016

DSİ 21. REGION DIRECTORATE

GİRESUN DRINKING PROJECT CONSTRUCTION

10.02.2015

29.12.2015

İLLER BANK

ÇAT, GÜRYILDIZ, GÜRÇEŞME VE GÖLGELİ (TOKAT) SEWERAGE FINAL PROJECT

10.07.2015

29.12.2015

İLLER BANK

ŞEFAATLİ – DEDEFAKILI SEWERAGE FINAL PROJECT

16.02.2015

18.12.2015

İLLER BANK

BOYABAT-SARAYDÜZÜ-DURAĞAN GROUP SOLID WASTE DISPOSAL PLANT FINAL PROJECT

24.02.2012

19.11.2015

DSİ 11. REGION DIRECTORATE

TEKİRDAĞ SARAY AYVACIK DAM CONSTRUCTION PROJECT

13.07.2015

06.10.2015

BASKİ GENERAL DIRECTORATE

EDREMİT İLÇESİ AKÇAY MAHALLESİ İÇME SUYU WAREHOUSE, NETWORK AND PUMPING LINE CUTTING PROJECT

28.06.2012

01.10.2015

EÜAŞ

KOYULHİSAR LANDSLIDE GEOLOGICAL GEOTECHNICAL STUDY

04.07.2012

04.03.2014

İNTAŞ İNŞ. TAAH. TİC. A.Ş.

 

AL-TUZ KENTİ CONSTRUCTION OF MAPS AND PROJECT STUDIES OF WASTE, WASTEWATER AND WASTEWATER TREATMENT PLANT PROJECTS

24.10.2013

15.02.2014

HİTİT ÜNİVERSİTY RECTORATE

KUZEY YERLEŞKE PREPARATION OF INFRASTRUCTURE AND ROAD PROJECTS

07.03.2012

29.07.2014

DSİ 10. REGION DIRECTORATE

ŞIRNAK CİZRE DRINKING WATER PROJECT CONSTRUCTION

02.12.2010

21.10.2013

DSİ 10. REGION DIRECTORATE

DİYARBAKIR - ERGANİ DRINKING WATER PROJECT CONSTRUCTION

13.04.2011

25.09.2013

DSİ 5. REGION DIRECTORATE

ÇORUM KOÇHİSAR BARAJI STAGE I. DRINKING WATER TRANSMISSION LINE CONSTRUCTION PROJECT

18.02.2011

19.03.2012

İLLER BANK GENERAL DIRECTORATE

 

KARAAĞAÇ (BALIKESİR) SEWERAGE NETWORK APPLICATION PROJECT

23.06.2011

15.02.2012

İLLER BANK GENERAL DIRECTORATE

TEKMEN (MERSİN) SEWERAGE NETWORK APPLICATION PROJECT

27.08.2010

07.02.2012

ASKİ GENERAL DIRECTORATE

ANKARA GREAT CITY MUNICIPALITY OF ANKARA PROJECT OF CONSTRUCTION FOR NORTHERN LOCATION AREA FOR VILLAGES AND DISTRICTS WATER TREATMENT, WAREHOUSE, PUMP STATION

28.01.2011

29.11.2011

 

 İLLER BANK GENERAL DIRECTORATE

BEYPAZARI (ANKARA) SEWERAGE FINAL PROJECT

21.01.2011

19.10.2011

 

İLLER BANK GENERAL DIRECTORATE

KUMBAĞ (TEKİRDAĞ) SEWERAGE FINAL PROJECT

16.04.2010

02.05.2011

İLLER BANK GENERAL DIRECTORATE

SAĞLAMTAŞ (TEKİRDAĞ) - AHMETBEY (KIRKLARELİ) SEWERAGE FINAL PROJECT

02.04.2010

10.03.2011

 

İLLER BANK GENERAL DIRECTORATE

KAVAKLI (KIRKLARELİ) SEWERAGE FINAL PROJECT

03.11.2010

27.12.2010

STATE IRON WAYS 2nd REGION DIRECTORATE

ANKARA - KAYSERİ LINE ELMADAĞ - SITUATED BETWEEN RIVER STATIONS  116 m. LENGTH TUNNEL NUMER 12  PREPARATION FOR THE PROJECT FOR THE CONVERTING TO A OPEN CUT EXCAVATION

05.12.2008

02.11.2010

STATE IRON WAYS 2nd REGION DIRECTORATE

IRMAK- ZONGULDAK, HAYDARPAŞA-ANKARA-KAYSERİ, BOĞAZKÖPRÜ-ULUKIŞLA PREPARATION OF 48 POINTS INFRASTRUCTURE PROJECTS

18.09.2007

04.05.2010

ELBİSTAN MUNICIPALITY

ELBİSTAN MUNICIPALITY DRINKING WATER REHABILITATION AND WASTEWATER TREATMENT PROJECT

08.01.2009

19.04.2010

DSİ GENERAL DIRECTORATE

 

BODRUM YARIMADASI REVISION OF DRINKING WATER TRANSMISSION LINE PROJECT

24.08.2009

19.11.2009

DSİ GENERAL DIRECTORATE

ÇANKIRI DRINKING WATER TRANSMISSION LINE CONSTRUCTION PROJECT, SECTION 3. STORAGE AND AUTOMATION BUILDING CONSTRUCTION PROJECT

17.04.2008

18.05.2009

 

İLLER BANK GENERAL DIRECTORATE

BEYPAZARI (ANKARA) SOLID WASTE DISPOSAL PLANT PROJECT

03.07.2007

29.01.2009

 

İLLER BANK GENERAL DIRECTORATE

SERİNHİSAR (DENİZLİ) WASTEWATER TREATMENT PLANT PROJECT FINAL

19.04.2007

09.06.2008

 

İLLER BANK GENERAL DIRECTORATE

ANAMUR (MERSİN) DRINKING WATER FINAL PROJECT

21.08.2006

20.03.2007

 

İLLER BANK GENERAL DIRECTORATE

DEREBAĞ (KAYSERİ) SEWAGE NETWORK PRACTICE PROJECT

05.05.2005

05.07.2006

 

İLLER BANK GENERAL DIRECTORATE

SÜRMENE (TRABZON) DEEP SEA DISCHARGE FINAL PROJECT

29.07.2005

18.04.2006

TURKISH DEVELOPMENT BANK A.Ş.

OKURCALAR (ANTALYA) WASTE WATER TREATMENT PLANT AND SEWERAGE COLLECTOR LINE APPLICATION PROJECT

30.01.1997

10.10.2001

T. C. BAŞBAKANLIK GAP BÖLGE KALKINMA İDARESİ BAŞKANLIĞI

BESNİ SEWERAGE NETWORK AND WATER TREATMENT PLANT PROJECT

13.10.2000

26.09.2001

İLLER BANK GENERAL DIRECTORATE

TÖMÜK-KARGIPINARI-ARPAÇBAHŞİŞ (MERSİN) SEWERAGE APPLICATION PROJECTS

08.10.1998

22.11.2000

İLLER BANK GENERAL DIRECTORATE

 

KARATAŞ (ADANA) MUNICIPALITY SEWERAGE APPLICATION PROJECTS

10.11.1999

24.01.2000

AKŞEHİR ORGANIZED INDUSTRIEL ZONE

 

AKŞEHİR OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

18.03.1999

29.11.1999

 

İLLER BANK GENERAL DIRECTORATE

SEYDİLER (KASTAMONU) DRINKING WATER PROJECT

19.11.1996

09.11.1999

 

KAYSERİ - İNCESU ORGANIZED INDUSTRIEL ZONE

KAYSERİ - İNCESU OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

15.11.1996

05.11.1999

REPUBLIC OF TURKEY PRIME MINISTRY GAP REGIONAL DEVELOPMENT ADMINISTRATION

YAVUZELİ SEWERAGE NETWORK AND WATER TREATMENT PLANT PROJECT

01.09.1998

04.10.1999

İLLER BANK GENERAL DIRECTORATE

YILDIZELİ (SİVAS) DRINKING WATER PROJECT

29.05.1995

19.04.1996

 

İLLER BANK GENERAL DIRECTORATE

ERASLAN (AMASYA) DRINKING WATER PROJECT

29.05.1995

26.12.1995

 

İLLER BANK GENERAL DIRECTORATE

ARATOL (AKSARAY) DRINKING WATER PROJECT

17.03.1994

01.12.1995

 

UŞAK ORGANIZED INDUSTRIEL ZONE

UŞAK OSB ETÜT ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

12.04.1995

02.10.1995

 

İLLER BANK GENERAL DIRECTORATE

SANCAKLIBOZKÖY (MANİSA) DRINKING WATER PROJECT

18.05.1995

30.06.1994

 

İLLER BANK GENERAL DIRECTORATE

ÇAMLIYAYLA (İÇEL) DRINKING WATER PROJECT

22.02.1994

16.05.1994

 

İLLER BANK GENERAL DIRECTORATE

ŞARKÖY (TEKİRDAĞ) DRINKING WATER PROJECT

01.09.1993

28.04.1994

 

İLLER BANK GENERAL DIRECTORATE

NAZİMİYE (TUNCELİ) SEWERAGE NETWORK APPLICATION PROJECT

14.06.1993

21.04.1994

 

İLLER BANK GENERAL DIRECTORATE

SENİRKENT (ISPARTA) DRINKING WATER PROJECT

10.02.1994

08.04.1994

 

İLLER BANK GENERAL DIRECTORATE

YEŞİLOVA (AKSARAY) DRINKING WATER PROJECT

01.09.1993

08.04.1994

 

İLLER BANK GENERAL DIRECTORATE

KARLIOVA (BİNGÖL) SEWERAGE NETWORK APPLICATION PROJECT

14.06.1993

31.01.1994

 

İLLER BANK GENERAL DIRECTORATE

ARMUTALAN (MUĞLA) DRINKING WATER PROJECT

30.03.1993

02.12.1993

 

İLLER BANK GENERAL DIRECTORATE

KUYULUK (İÇEL) DRINKING WATER PROJECT

03.12.1991

24.08.1992

 

İLLER BANK GENERAL DIRECTORATE

BEYLİKOVA (ESKİŞEHİR) DRINKING WATER PROJECT

 

 

 

SOLID WASTE PROJECT

 

STARTING DATE

END

DATE

ADMINISTRATION

PROJECT NAME

02.05.2017

ongoing project

İLLER BANK

BOYABAT-SARAYDÜZÜ-DURAĞAN (SİNOP)  SOLID WASTE DISPOSAL PLANT REVISION PROJECT

22.12.2016

ongoing project

SAKARYA GREATER MUNICIPALITY

SAKARYA SOLID WASTE REGULAR STORAGE PLANT 2 LOT CONSTRUCTION APPLICATION PROJECTS AND PREPARATION OF PRINCIPAL DIRECTORS

11.11.2015

ongoing project

İLLER BANK

ESKİŞEHİR (MERKEZ) OLD LANDFILL REHABILITATION, FEASIBILITY AND FINAL PROJECT AND ESKİŞEHİR (CENTRAL) WASTE WATER TREATMENT PLANT FEASIBILITY AND PREPARATION FOR THE FINAL PROJECT

15.12.2016

21.06.2017

İLLER BANK

Troas  Solid Waste Association  (Ayvacık-Bayramiç-Ezine-Geyikli-Gülpınar-Mahmudiye-Bozcaada-Küçükkuyu) (Çanakkale)  Solid Waste Disposal Facility Project

16.02.2015

18.12.2015

İLLER BANK

BOYABAT-SARAYDÜZÜ-DURAĞAN GROUP SOLID WASTE DISPOSAL PLANT FINAL PROJECT

04.09.2014

30.04.2015

İLLER BANK

TROAS SOLID WASTE UNIT (AYVACIK-BAYRAMIC-EZINE-GEYİKLİ-GULPINAR-MAHMUDİYE-BOZCAADA-KÜÇÜKKYYU) (ÇANAKKALE) SOLID WASTE DISPOSAL PLANT PROJECT

04.09.2009

24.11.2009

PRIVATE ENVIRONMENTAL PROTECTION CORPORATE

FOÇA SOLID WASTE REGULAR STORAGE PLANT COVERAGE PROJECT CONSTRUCTION

17.04.2008

18.05.2009

İLLER BANK GENERAL DIRECTORATE

BEYPAZARI (ANKARA) SOLID WASTE DISPOSAL PLANT PROJECT

14.09.2010

06.12.2010

PRIVATE ENVIRONMENTAL PROTECTION CORPORATE

ORTACA DOMESTIC SOLID WASTE REGULAR STORAGE PLANT 2nd STAGE  WORKSHOP PROJECT CONSTRUCTION

 

 

 

ORGANIZED INDUSTRIEL ZONE PROJECTS

 

STARTING DATE

END

DATE

ADMINISTRATION

PROJECT NAME

07.07.2016

ongoing project

SİVRİHİSAR PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

SİVRİHİSAR OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

24.02.2016

ongoing project

KARABÜK PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

KARABÜK OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

04.02.2016

03.07.2016

VARSAK SMALL INDUSTRIAL DEPARTMENT PRESIDENCY

 

VARSAK KSS SMALL INDUSTRIAL DEPARTMENT STUDY DESIGN ENGINEERING SERVICES

03.12.2015

18.06.2016

SEYDİLER PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

SEYDİLER OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

03.09.2014

ongoing project

ALAPLI (ZONGULDAK) OSB ORGANIZED INDUSTRIAL ZONE

 

ALAPLI OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

16.11.2015

ongoing project

ŞANLIURFA PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

ŞANLIURFA  OSB 3. STAGE EXTENSION AREA STUDY PROJECT ENGINEERING SERVICES

22.04.2015

02.10.215

ADANA HACI SABANCI PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

ADANA HACI SABANCI OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

15.02.2014

22.06.2015

GAZİANTEP PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

GAZİANTEP OSB 5. KISIM ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

10.02.2015

10.07.2015

MARDİN PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

MARDİN OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

07.03.2014

08.09.2014

MİLAS PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

MİLAS OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

03.11.2004

04.03.2010

KEMALPAŞA PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

KEMALPAŞA OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

20.03.2008

12.09.2008

ANADOLU PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

ANADOLU OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

31.08.2006

11.07.2007

BOZÜYÜK PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

BOZÜYÜK OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

16.04.2006

08.06.2006

KIRKLARELİ PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

KIRKLARELİ OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

22.06.1995

03.03.2004

BANDIRMA PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

BANDIRMA OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

10.10.1999

03.03.2004

SAKARYA III. PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

SAKARYA III. OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

22.05.2001

31.03.2003

KOZAN PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

KOZAN OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

10.11.1999

24.01.2000

AKŞEHİR PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

AKŞEHİR OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

19.11.1996

09.11.1999

KAYSERİ - İNCESU PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

KAYSERİ - İNCESU OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

25.12.1997

06.12.1998

 

SAKARYA II. PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

SAKARYA II. OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

12.07.1995

13.11.1998

ADIYAMAN PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

ADIYAMAN OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

20.03.1996

06.01.1998

OSMANİYE PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

OSMANİYE OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

17.03.1994

01.12.1995

UŞAK PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

UŞAK OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

21.12.1993

18.11.1994

KAHRAMANMARAŞ PRESIDENCY OF ORGANIZED INDUSTRIAL ZONE

 

KAHRAMANMARAŞ OSB ORGANIZED INDUSTRIEL ZONE STUDY DESIGN ENGINEERING SERVICES

 

 

 

 

 

 

 

Copyright © Prof. Dr. Onur Özsoy